Topic: Installation-driven foundation selection for 15MW+ turbines As developers plan for the next decade, offshore wind turbine capacities are expected to increase to 20MW and beyond. This, coupled with increased water depths, means that the loads placed on foundations will only increase, requiring longer (100m+), larger (12m+ at base, 10m+ at top), and heavier (2000Te+) foundations. Join Acteon for coffee and cake while we discuss the challenges and solutions of installing larger turbines in deeper water. Speaker: Ben Andrew, Director, 2H (a brand in Acteon’s Advanced Systems Engineering segment)